
Created alongside the U.S. Forest Service, this case study examines how aerospace manufacturer Janicki Industries focused on using mass timber to pivot away from long lead times with steel and accelerate construction through a prefabricated, design-build approach for their 185,000-square-foot facility. The project moved from schematic design to a permit in just four months, with the completed building opening only a year later. Download the case study.

Funded by the Softwood Lumber Board